OPEC Concludes Assessment Of Nigeria’s Maximum Sustainable Capacity For 2027

OPEC Concludes Assessment Of Nigeria’s Maximum Sustainable Capacity For 2027

The Organisation of the Petroleum Exporting Countries (OPEC) has assessed Nigeria’s Maximum Sustainable Capacity (MSC) for 2027 to be much higher than Nigeria’s current Quota of 1.5 million barrels per day.

The MSC represents the crude oil production capacity attainable within 90 days and sustainable for a full year, taking into account all planned maintenance.

The assessed capacity will serve basis for determining Nigeria’s crude oil production quota in June 2027 and the baseline for subsequent annual capacity assessments.

The Honourable Minister of State for Petroleum Resources (Oil) and Nigeria’s Head of Delegation to OPEC, Senator Heineken Lokpobiri, Ph.D., explained that the assessment of the MSC does not constitute a new production quota but establishes the capacity upon which Nigeria’s 2027 crude oil production quota allocation will be considered.

The Minister noted that the assessment reflects the ongoing efforts of the administration of President Bola Ahmed Tinubu, GCFR, to expand Nigeria’s crude oil production capacity through policy and fiscal reforms, increased investments and improved operational efficiency.

Lokpobiri reiterated that Nigeria’s ambition remains to grow its production capacity beyond the assessed figure, stressing that the Federal Government will continue to create the enabling environment for both indigenous and international operators to increase investments and bring additional production on stream.

He further reaffirmed Nigeria’s commitment to OPEC and the Declaration of Cooperation, while emphasising the importance of ensuring that the country’s production allocation reflects its sustainable production capacity.

A release by Nneamaka Okafor, Media and Communications aide to the Honourable Minister of State for Petroleum Resources (Oil), says Nigeria will continue to engage OPEC to ensure that all achievements recorded with respect to the ongoing effort to grow production to 3 mbpd by 2030 is taken into consideration in subsequent reviews.

Leave a Reply

Your email address will not be published. Required fields are marked *